PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installing duct work at the 1st Floor Facing East (800x600).jpg Installing sprinkler piping at the 1st floor Facing South-East (800x600).jpg Welded beam clips at the 4th floor at the East Elevation (800x600).jpg
Previous page Welded beam clips at the 4th floor at the East Elevation (800x600)
Welded beam clips at the 4th floor at the East Elevation (800x600)